INTRODUCTION

PT. Cilegon Fabricators was established in 17 March 1984. It is located in heavy industries area in Cilegon, Banten Province, about 100 km western of Jakarta, exit from Jakarta Merak high – way  at Cilegon Timur Gate.

With 57.000 m² total under roof fabrication shop open yard for full assembled of heavy product and 300 m² skid rail for loadout of heavy product. Cover storage for components, our total area of fabrication facilities 251,525 m² and engineering capability support by Compress and Tekla Structures (X-steel) Software.

Having private seaport and bounded area to make convenience for receiving raw material and shipping out of bulky products.

HSE Policy

HSE Policy

 
Quality Policy

Quality Policy

We, PT. CF are committed to provide Excellent Fabricated Products or Services which will add value to our entire Customer, every time. To achieve Excellent Fabricated...

 
Blasting and Painting

Blasting and Painting

  Facilities : – Under roof painting shop : 2,000 m² – Blasting room / chamber size 15 m x 6 m x 6 m Auto Blast machine for raw material – Auto...

 
Heat Recovery Steam Generator (HRSG)

Heat Recovery Steam Generator (HRSG)

Capacity: 6,000 ton per year for total module assembly   Facilities: Under roof workshop    : 8,829 m² cover all activities for Finning and Harp Fabrication Common...

 
Boiler Pressure and Piping

Boiler Pressure and Piping

  CAPABILITY 18,000 Ton per year (existing ave) and further expansion become 20,000 Ton   FACILITIES Under Roof Workshop 19,827 m2 could cover all activities...

 
 

HSE Policy

HSE Policy

 
Quality Policy

Quality Policy

We, PT. CF are committed to provide Excellent Fabricated Products or Services which will add value to our entire Customer, every time. To achieve Excellent Fabricated...

 
Blasting and Painting

Blasting and Painting

  Facilities : – Under roof painting shop : 2,000 m² – Blasting room / chamber size 15 m x 6 m x 6 m Auto Blast machine for raw material – Auto...

 
 
Smiley face
Smiley face

Location

Smiley face